BRCKS for fire safety remediation

The Golden Thread, built automatically. BRCKS creates the timestamped digital record the Building Safety Act demands — from your team's existing WhatsApp workflow, not a separate system they won't use.

Why fire safety remediation needs BRCKS

  • Building Safety Act 2022 requires complete, dated, defensible records.
  • Compliance systems your site team won't use produce records nobody trusts.
  • Once cladding is replaced, the original condition is gone — you need a permanent visual record.

Features

  • WhatsApp capture
  • Automatic site diary
  • Variations with audit trail
  • RFIs with external tracking
  • 360° site tours
  • Client / BSR portal

Example

"Tower A — cladding strip back complete on east elevation, levels 8-12." BRCKS timestamps the photos, pins them to the elevation drawing, and updates the Golden Thread — BSR-ready.

What the Golden Thread actually requires

The Building Safety Act 2022 expects information about a higher-risk building to be accurate, up to date, held digitally and handed on. In practice that means someone must be able to show, years later, what was found, what was installed, who signed it off and when. Remediation work destroys the evidence as it progresses: once the cladding is off and the new system is on, the only record of the original condition is the one you captured at the time.

How BRCKS builds it as you work

  • Every WhatsApp message, photo and voice note is filed to the block, elevation and level with an immutable timestamp.
  • 360° tours capture whole elevations and risers before they are closed up.
  • Fire-stopping and cavity barrier inspections are logged as snags with proof-of-fix photos and sign-off.
  • Design queries become tracked RFIs with a chase deadline against the consultant.
  • Scope changes become priced variations with dated written approval.
  • The daily record is written automatically by the site diary, not from memory at 9pm.

Why adoption is the whole battle

Compliance platforms fail on site for one reason: the operatives who hold the evidence will not log into them. BRCKS asks nothing of them beyond the WhatsApp message they were already sending, which is why the record stays complete instead of stopping three weeks after kick-off. Your BSR submissions, client reports and warranty file all come from the same trail.

Who has to be satisfied by the record

Fire safety remediation is unusual in how many parties need to read the same file. The client or freeholder wants progress and cost certainty. The Accountable Person needs to discharge a legal duty. The Building Safety Regulator may ask for information at gateway points. The warranty provider and the eventual building owner need to know what is behind the wall. Insurers and funders ask for the same evidence in a different format.

Producing five versions of the truth is how errors creep in. BRCKS holds one dated record and lets each party read the part that concerns them — the portal for the client, exports for the BSR file, a snag and sign-off log for the fire engineer.

Capturing what will soon be hidden

The evidence problem in remediation is timing. Cavity barriers, fire-stopping at service penetrations, insulation build-ups and riser details are all visible for a matter of days. Once the new system is installed, no amount of documentation can recreate what was there. Photographs taken at the time, filed to the correct elevation and level, with a date that cannot be back-edited, are the whole asset.

360° tours do the same job at room and elevation scale, which is why teams use them before closing risers and after strip-back. Both live in the same project as the diary, the snags and the RFIs rather than on somebody's phone.

RFIs, design changes and the paper trail

Remediation projects generate constant design queries because the as-built rarely matches the drawing. Each query becomes a tracked RFI with a named recipient and a deadline, so a four-week wait on a fire engineer's response is visible and provable rather than an argument at the end. When the answer changes the scope, it becomes a priced variation with dated written approval attached to the message that started it.

Start on one block

Run BRCKS on a single block or elevation for a fortnight and look at the trail it produced. Nothing changes for the operatives. Start a 14-day free trial, check pricing (subcontractors and clients free), watch the demo or talk to us to talk through your Golden Thread obligations.